BS EN 12350-1 PDF

Buy BS EN TESTING FRESH CONCRETE – PART 1: SAMPLING from SAI Global. said in BS EN , take a few samples throughout the pour for the best representation of the batch and make sure you take % of what you think you’ll . This British Standard specifies two procedures for sampling fresh concrete which are implemented by composite sampling and by spot.

Author: Shaktimuro JoJokinos
Country: Saint Lucia
Language: English (Spanish)
Genre: Education
Published (Last): 20 March 2011
Pages: 461
PDF File Size: 15.40 Mb
ePub File Size: 16.85 Mb
ISBN: 532-1-77132-118-9
Downloads: 81466
Price: Free* [*Free Regsitration Required]
Uploader: Mucage

The time for this to occur depends on the concrete temperature, cement type, mix proportions, the use of admixtures with set retarding properties and consistency of the concrete.

Ideally placing subsequent layers of fresh concrete should be undertaken as soon as practical to enable a fully compacted and monolithic element. Subscription pricing is determined be Find Similar Items This product falls into the following categories.

Record the temperature to sb nearest 0. Strike off the mold with the tamping rod in a screeding and rolling motion Remove concrete from the area surrounding the base to prevent interference with the movement of slumping concrete. Scope This standard covers the determination of the temperature of freshly mixed hydraulic-cement concrete.

Sampling of Freshly Mixed Concrete at the Field (BS EN ) – QA/QC Construction

In some big eb, imagine the time consumed to perform the composite sampling when there is a lot of concrete truck mixers in queue at the checkpoint area.

This European Standard specifies two procedures for sampling fresh concrete, by composite sampling and by spot sampling. Bz British Standard specifies two procedures for sampling fresh concrete which are implemented by composite sampling and by spot sampling. We use cookies to make our website easier to use and to better understand your needs. After this, the design mix specific to the particular type of structure recommends the discharge time limit waived against what is stated in the specifications.

Concrete cubes at the site Marking The 1230-1 specimens shall be marked clearly and indelibly, without damaging the specimen using a cub tag that contains the information related to the specimen Casting date, ticket number, specimen ID, location of sampling….

  DESCARGAR CALCULO VECTORIAL MARSDEN PDF

This standard is not included in any packages. Compacting by hand with compacting rod or bar Distribute the strokes in a uniform manner over the cross-section of the mould. 1350-1 basket is empty. Where required, the specification of a maximum time between placing layers of concrete should take bw of the likely temperature of the concrete, cement type, mix proportions, the use of admixtures with set retarding properties and consistency of the concrete.

Worldwide Standards We can source any standard from anywhere in the world. Complete the temperature measurement within 5 min except for concrete containing the coarse aggregate of a nominal maximum size greater than 75 mm which may require up to 20 min for the transfer of heat from the aggregate to the mortar. The most common method used in the sampling for casting with large volume of concrete is the spot sampling which is less time intensive due to the rate of pouring.

As the load is discharged, sampling should be taken from the whole width and depth not just the top part. Compaction of the concrete The concrete shall be compacted immediately after placing in the moulds in such a way as to produce full compaction of the concrete with neither excessive segregation nor laitance.

Procedure for Slump Test Apparatus being readied for slump test activity Fill the mold in three layers of approximately equal height. Depending on the consistency of the concrete and the method of compaction, moulds shall be filled in one or more layers to achieve full compaction.

Ways of how the sample shall be vibrated: When mixing and sampling of concrete is done in a laboratory, different procedures may be required. Usually, especially for big projects where a large quantity of concrete is cast, both parties come up with the designed mix and validated through trial mixes to compensates for this particular problem.

Contents of BS EN Standards Subsctiption may be the perfect solution. Surface leveling Remove the excess concrete above the upper edge of the mould using the steel trowel or float and carefully level the surface. This site uses cookies. If the document is revised or amended, you will be notified by email. Protect the sample from sun, wind, and other sources of rapid evaporation, and from contamination. Report from the sample includes: It depends upon the project specifications on particular project area of jurisdiction.

  A SOCIEDADE CONTRA O ESTADO PIERRE CLASTRES PDF

Click here to find out how to access this document.

Procedure for Slump Test. Specifies two procedures for sampling fresh concrete: Search all products by. Metallic, Frustum of a cone Alternative materials are allowed if requirements are met comparability tests Tamping Rod Round, straight steel rod, length mm and diameter 16mm Tamping end rounded to a hemispherical tip Measuring Device Ruler Marked in increments of 5 mm or smaller Length of at least mm In addition, a scoop is needed.

Scope This practice specifies methods for making and curing test specimens for strength tests. Clean all the apparatus prior to use. A sample of concrete is placed in a mold, shaped as the frustum of a cone, and compacted. Rod each layer 25 times using the rounded end of the tamping rod. Click to learn more. Thank you for another wonderful post. Apparatus Mold Mold use for slump test of fresh concrete Dimension in mm Metallic, Frustum of a cone Alternative materials are allowed if requirements are met comparability tests Tamping Rod Round, straight steel rod, length mm and diameter 16mm Tamping end rounded to a hemispherical tip Measuring Device Ruler Marked in increments of 5 mm or smaller Length of at least mm In addition, a scoop is needed.

BS EN 12350-1:2009

In the case of self-compacting concrete, the mould shall be filled in one operation and no mechanical compaction shall be applied during filling or after the mould is filled. Procedure Place the TMD in the concrete so that the sensing portion is submerged a minimum of 75 mm.

Move the scoop around the perimeter of the mold to ensure even distribution 112350-1 material and minimize segregation. Already Subscribed to this document. This website is best viewed with browser version of up to Microsoft Internet Explorer 8 or Firefox 3. Half of the strokes near perimeter, and then progressing with vertical strokes spirally toward the center.

Menu Home Blog About Contact. Again there may be more recent versions of the document.