GMW 8287 PDF

Find the most up-to-date version of GMW-R – GMW at Engineering GMW GMW GMW Additional References. EIA/JEDEC JESDAB. © Copyright General Motors Corporation All Rights. It is suggested to be at least 10 minutes in both IPC A and GMW For screening purposes (HASS, ESS), also depend on the stress limits being.

Author: Grokasa Kagajar
Country: Burma
Language: English (Spanish)
Genre: Art
Published (Last): 27 August 2016
Pages: 309
PDF File Size: 1.57 Mb
ePub File Size: 17.30 Mb
ISBN: 235-9-22040-190-7
Downloads: 41237
Price: Free* [*Free Regsitration Required]
Uploader: Shaktigis

The minimum dwell period at each thermal extreme is ten minutes. Therefore, optimisation of maximum stress to the product is beneficial. However, since the sample may not be fully operational, it will become necessary to reduce the thermal stress i.

Random Vibration (RS)

These records are stored and shall contain sufficient information to permit repetition of the test test report, data, notes, etc. Grms – Vibration induced acceleration forces, where G is the unit-less value g,w acceleration relative to gravity.

Accept the ambiguity that is intrinsic to an explorative development test. Significant degradation in these margins could pose a significant risk to the screening process in that the previously demonstrated “Safety of HASS” would have become invalid. The product will be installed in the screening fixture, electrically connected, tested for proper function, screened, and the acceptable units returned into the production stream.

However, because the sample may not be fully operational, it is especially important to return to the “tickle level vibration” between each dwell to determine whether the sample is still functional.

Random Vibration (RS) | Center for Advanced Life Cycle Engineering

The fixture should be lightweight, GMW low in thermal mass, and ruggedly designed to sustain repetitive applications of the stress screen. Chamber technology for HALT is a repetitive shock vibration that functions with 6 degrees of freedom 3 linear and 3 rotational.

The reason constant monitoring is essential is the potential for unveiling a product problem is constantly changing during the screen. These stresses are specific to the product tested and are performed during each step stress to enhance additional failure precipitation and detection.

  EJERCICIOS RESUELTOS TEOREMA DE THEVENIN Y NORTON PDF

Durability Growth through HALT/HASS and Accelerated Testing

These charts will guide the actions and reactions and provide a sound foundation for decision-making based on the data being taken. Calculate your chamber and fixturing needs, in advance, to insure a planned execution process.

The root cause analysis process must be fully documented relative to: Develop simplest method for constant monitoring Step 3: The HALT chamber will control the temperature of the incoming air stream? Simultaneous multi-axial vibration generates synergistic effects of all modes being excited and a more realistic vibration stress loading condition, which better approximates real world vibrations being experienced by products The stress profile shown in Figure 1 at the bottom resembles the test descriptions in IPC A, IEST-RP-PR Safety for electronic systems High-frequency Filtering of DC Power Lines Technical, constructional and practical issues with filtering on dc power lines.

Include all calculations used to derive these values in the documentation.

The customer and contract manufacturer should agree prior to this step as to clear definition of “without incident”. A typical special circumstance would be “when the phase change of materials is close in temperature to the operating limit. Locations of product response sensors thermocouples and accelerometers? Attributing a root gjw to a specific failure requires a full understanding of the problem.

The production process stabilizes, gkw in an average yield line and control limits on the control chart.

Plastic cases should be removed to allow electronics to reach higher temperatures. The product is damaged and does not recover when the stress is reduced i. The relationship relative to this topic gkw be based on a desire to operate as a partnership of learning organizations, share data in a climate devoid of fear, reaction to problems with an understanding of the failure mechanisms involved and moderated by an understanding of the concepts of “signals in a noisy environment”.

  CONFESIONES DE UN MACHISTA ARREPENTIDO PDF

The Contract Manufacturer proudly shares the control chart and Pareto chart information with the customer so that cross-platform interactions may facilitate additional improvement in other product, and products that are yet to be.

Example of Vibration Calibration: The process continues after discovering the failure modes in the HALT.

The GlidePath should converge into a screening audit process. Control charts are started along with all Pareto charts. Identify maximum and minimum temperature for critical materials under test The use of finite element analysis in designing the fixture is suggested to manage the stress and displacement characteristics during vibration.

This decision must be made jointly between Contract Manufacturer and the customer. Functional testing is performed at the conclusion of the ten-minute dwell period. Documentation shall detail the occurrences of sample degradation and the conditions at which they occurred, including the operating and destruct limits of vmw sample and any other important comments.

This team will also manage the information and data obtained from the screening process and should maintain the Statistical Control Chart “P” Chart and Pareto charts as defined above. Documentation shall also provide evidence of how the functional test objectives as defined in the Pre-HALT meeting were achieved.

Parts that are used to verify the screening effectiveness, even though they receive 4 screens, can be sold because “Safety of HASS” proves that they can withstand at least 20 screens.

A pseudo-product should also be identified and thermocoupled fmw become the product control for chamber operation.