HUAWEI CDMA BTS 3606 PDF

Default Re: Huawei CDMA E BTS Max Power??? HI I think it can be more than 20W because the RF board support MAX 60W. The 3rd Global CDMA Operation and Development Forum, themed. To illustrate this further, we can note that Huawei BTSCE power With Huawei latest CDMA BTS products, based upon the physical network. indoor type) and BTSAC (for outdoor type) are The complete series of CDMA BTSs, and relevant Thus, for the same traffic in a sector, a Huawei BTS.

Author: Kagalar Babei
Country: Peru
Language: English (Spanish)
Genre: Software
Published (Last): 27 March 2018
Pages: 121
PDF File Size: 2.65 Mb
ePub File Size: 10.23 Mb
ISBN: 369-8-13433-673-6
Downloads: 65185
Price: Free* [*Free Regsitration Required]
Uploader: Nikotaxe

Watch out for the sharp edges on the RF fan panel during the installation of RF cables lest it hurt your fingers. Fix them onto the units. Clamp the cables to the bracket. The cabinet is placed upside down. Normally, the fan box is installed upon delivery. The letters A, B, C as shown in Figure are not cable labels. Figure Installing a board 2 Tighten the screws clockwise on the front panel, as shown in Figure They are used for the convenience of installation description.

CDMA grows greener

Figure Installing a cabinet on the floor without sufficient bearing capacity Tools The following tools are required: Wooden cases are generally used to pack heavy objects like racks, batteries, and so on. Conducting Insulation Test To conduct an insulation test, proceed as follows: That is, 1 m 39 in.

Other Cables The power cable and the grounding cable are routed straight and bundled neatly. Route the alarm cables coming in from the other side of the enclosure through the cabling holes on both sides of the 8-E1 module and then to the respective slots. This manual also for: Outline Figure shows the outline of the lower support. Chapter 4 Installing Cables Thus, you do not need to install these cables on site. Table of Contents Add to my manuals Add.

  DESCARGAR MALA ONDA ALBERTO FUGUET PDF

This section introduces how to install the power module and what to pay attention during the installation. For the 24 V power input, the voltage drop of the cable from the 24 V power supply system to the power input port of the BTS must be less than or equal to 0.

Installation Method You need to prepare the U-bar support on the site. Positioning the Cabinet and Removing the Floor Caution: Csma, the equipment will suffer severe damages. GND cables for indoor cabling racks and for outdoor cabling racks.

Tighten the bolts on the cover. Enter text from picture: Feed back the situation to the local Huawei Representative Office. This chapter describes how to install and use these two types of DDF. Connect the two probes to the paint-free place of the base and the expansion bolt.

The packing case is in good condition. Environmental Protection This product has been designed to comply with the requirements on environmental protection. Start Position the cabinet Remov e the Keep the huaeei intact. Tighten the bolts at the front face of the cabinet.

Determine the length of the grounding cables according to their actual cabling path, that is, the route from the binding post of BTS cabinet to the wiring holes of the grounding protection bar of the cabinet. Chapter 4 Installing Cables introduces the categories of cables installed on site, cable distribution methods, and procedures of connecting various cables in BTS cabinet.

  BUSCOPAN COMPOSTO AMPOLA BULA PDF

Page 15 The packing case is in good condition. Do not bend an optical fiber to a right angle upon distribution.

Make sure the support is level and then cross-fasten the bolts of the lower support to 45 N-m in-lb with a torque wrench. It is divided into six chapters: Cut the 3660 along the seams of the carton cover using a knife.

The panel is clean without obvious damage. Insert the boards according to the names on the relevant nameplates to avoid any mistake.

The power cable and the grounding cable are routed straight and bundled neatly. To avoid damaging equipment inside, do not apply too much force. Loosen the screw in the small round hole such as —48V connecting hole on the power input side of the terminal block using a flat-head screwdriver.

Huawei BTS3606 Installation Manual

Lead the bolts through the lower support. The alarm box is correctly installed according to the huaweu. Got it, continue to print. Administration Building, Huawei Technologies Co. The BTS in the multi-channel mode does not support the power synthesis function.

Huawei CDMA E BTS Max Power ???

When handling the cabinet, hold on the solid places such as the upper cable rack or bone frame. Page 43 5 M6x20 combined screw Figure Installing a cabinet on the antistatic floor Figure shows how to install a BTS cabinet on the floor without sufficient bearing capacity.

Thus, you do not need to install these cables on site. By pressing ‘print’ button you will print only current page.