ILIJAN POWER PLANT PDF

Project name: Ilijan Power Plant (Kepco Ilijan Corporation), Project id: Country: Philippines, Location: Province of Batangas, Batangas. Financial Closure. Ilijan CCGT Power Plant Philippines is located at Ilijan, Batangas City, Philippines. Location coordinates are: Latitude= , Longitude. Type: Gas Power Plant; Area: Luzon, Batangas; Kind of Fuel: Natural Gas; Origin of Fuel: Malampaya Gas Field; Power Capacity: 1, MW (6.

Author: Mazujar Nikozilkree
Country: Tunisia
Language: English (Spanish)
Genre: Photos
Published (Last): 17 March 2008
Pages: 378
PDF File Size: 4.38 Mb
ePub File Size: 3.60 Mb
ISBN: 868-4-53285-608-4
Downloads: 59498
Price: Free* [*Free Regsitration Required]
Uploader: Shalkis

Those figures are remarkable, considering the remoteness of the project and the extensive infrastructure that poower to be built to support it see table. It was literally carved out of the Philippine jungle by an international consortium of developers, engineers, and contractors. The plant was operated on liquid fuel gas oil, naptha, condensate until the end of This site uses cookies.

Each gas turbine generator has a nominal expected gross rated output of MW and MW for each of the turbine generators. The plant cannot operate in simple-cycle mode because it has no bypass stack. During natural gas firing, one operates while the other two remain on standby.

Commercial operation was in October 1, The plant started using natural gas on commissioning stage in February In addition, all the plant water has to be made from seawater, including NOx injection water. Leave a Reply Cancel reply Enter your comment here The G gas turbine uses steam taken from the bottoming cycle for cooling the combustor liner. The water treatment system provides a continuous supply of the high-quality demin water required for plant makeup, gas turbine water injection for NOx control, and dilution water for chemical feed systems.

  CANCO DEL LLADRE LLOBET PDF

The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners. Notify me of new comments via email. The 1,MW Ilijan combined-cycle plant is truly a greenfield plant. But for Ilijan, the end justified the means.

Ground was broken on March 15,with the start of civil construction works. REOL for the construction phase. Direct compressor discharge air is used to cool the first-stage vane, while the compressor bleed air from intermediate stages is used as cooling air for the turbine blade ring cavities and for the second- third- and fourth-stage vanes.

Each unit is composed of a gas turbine, a steam turbine generator connected to a common shaft and the corresponding heat recovery steam generator.

Ilijan Combined-Cycle Power Plant, Southern Luzon, Philippines | Power Generation

Intermediate steam and primary superheater outlet steam serve as a backup for GT combustor transition piece cooling and are returned to the hot reheat steam. Obstacles that developers of plants in the U. Ilijan combined-cycle project operational summary.

From there, the gas is transported through a in-diameter onshore pipeline running 9 miles to the plant. The plant is located at Sta.

Power Gas Markets

The plant also includes a transmission line which interconnects the Sta. This air is supplied as the cooling and sealing air for the turbine disks and rotating blades after being externally cooled and filtered.

The plant, which is designed to be dispatched Figure 2 and to operate at or near full load, consists of two MW nominal power blocks.

All three trains can be put into service when powerr plant burns diesel oil to supply adequate makeup demin water to the combustion turbines when water injection is used to control NOx emissions. Commercial operations using natural gas as the primary fuel commenced on January 1, The DLN combustor in the MHI G gas turbines consists of a pilot nozzle, eight main fuel nozzles, air bypass valves, and a double-wall structure for basket ilijna transitions.

  HUAWEI U8665 MANUAL PDF

The plant is rated at 1, MW net on the high-voltage side of the main transformers. First G series turbine outside Japan The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners. The integrated iiljan controls are based on the ABB Bailey distributed digital control system. The water treatment system works in three stages: Rita power plant consists of four 4 units with a plant rated capacity of MW each when operating on liquid fuel Commercial operation of the power plant was lower June 5, However, the combustor exit temperatures are different.

Rita power plant to the Calaca substation.

Power Gas Markets | DOE | Department of Energy Portal

RSS feed for comments on this post. Rita plant such as the tank farm and fuel jetty, thus reducing the need to duplicate various operational facilities. The plant entered commercial service on June 5, The power station uses diesel as back-up fuel. In the G combustor, the basket and transition are known as the combustor swirler assembly and combustor liner, respectively.

Liquid fuel was used as back-up fuel thereafter. Entries and comments feeds. You are commenting using your WordPress.

To find out more, including how to control cookies, see here: San Miguel Energy Corporation who was declared as the highest bidder last 16 April won the administration of the 1, MW Ilijan.